The St Thomas Aquinas Primary School project involved the relocation of an existing shade structure and playground equipment within the school grounds to accommodate future development works. The project included site preparation, new footings, dismantling and reinstatement of the structures, and associated landscaping works including timber edging, DGB, and tan bark installation.
Pier Projects carefully coordinated the relocation works to ensure the safe disconnection, transport, and reinstallation of both the shade structure and play equipment in accordance with the original structural requirements. The works were completed within a live school environment, with a strong focus on safety, quality assurance, and minimising disruption to school operations throughout the project duration.